Bathroom Renovation - A Detail by detail Guide


Bathrooms are among the smallest rooms inside your home plus they are also 1 the costliest to renovate. Bathroom renovation is normally employment that, if carried out well, can add worth to a house and an excellent space filled with design and light.

Bathroom design

Bathroom design is the first region of your bathroom renovation you have to get right. Simply replacing the existing bathroom with the same style might not be enough. The main element to great bathroom style is to create it with the individuals who are going to utilize it at heart. However, make sure that the design of your bathroom has an over-all use factor as well. For example: If you were developing a bathroom for family members you could still design the bathroom with quick access to the shower and bath. This might ensure that the design would also work for individuals with limited flexibility. This means if you opt to sell your house or if you are renovating for income your design includes a wider market charm. Great bathroom style also uses the area well, considering the light or windows space, size of fittings, and drainage options. Acquire an idea to scale and down the sizes of your space. Mark the prevailing drainage points and water inlet factors. Jot down a wish set of the toilet fittings to want and need with their sizes. Now marry both collectively and see what suits. Note: Many bathroom drainages and water inlet points could be relocated but this does arrive at extra cost.

Bathroom remodel

If you have decided to do the task yourself or section of the work it's time to hire a skip bin and grab the old bathroom. If your house was made pre 1980 you might have fibro bathroom wall linings with asbestos in it and great treatment will need to be taken. You will require some complete body disposable overalls, vision protection, and quality dirt mask. Consult with your regional building authority or council about the regulation on bathroom asbestos wall structure lining removal.

Remove everything except the plumbing. If you keep carefully the bathroom plumbing in place you will not need to turn the drinking water off for your home. Also, you will have to jackhammer the ground tiles up and the sand cement bed they are laid on.

Bathroom Renovation and construction

Bathrooms must be built properly from the bottom up to ensure that the finished work is correct and true. This also ensures the look and appearance of the bathroom will have a great finish

THE TOILET Renovation Process

Install water and drainage pipe and electrical wires.
Install wall lining and ceiling and then install the bath hob and bath.
Waterproof the floor and shower and bath recess.
Correct nov the ground with sand cement prepared for tiling.
Lay floor and wall tiles and grout.
Install new bathroom vanity, fittings, and taps - install new electric.
Paint ceiling and last clean.
The first step - Plumbing and electrical
At this point, new plumbing is installed for clean hot and cool water and drainage. Attention needs to be used when positioning the brand new plumbing to ensure that the plumbing fixtures are right when the tiling is completed. For instance: To center a fitting in a shower recess you need to consider the thickness of the wall structure plank, tile glue, and tile so the fitting will be centered after the tiles are set up. The same pertains to setting up drainage pipes for a toilet; the wall lining and tile thickness must be taken into accounts so the pipe is in the correct placement when the toilet is usually installed after tiling. Also tough in any fresh electrical wires without linking them to the mains power.

The second step - Install wall structure and ceiling linings

Install your 6mm wall lining being cautious to nail the fibro board every 150mm without nailing into the brand-new pipes and electrical cables. The best way is definitely to measure and tag the pipe and cable layout on your new wall table with a pencil as you proceed. Screw up (or nail) the ceiling lining, plasterboard may be the most common. Nevertheless in case you are laying your tiles from ground to ceiling usually do not install the cornice as that is best done after tiling. In case you are not tiling to the ceiling go on and install the cornice following the wallboard and ceiling lining has been set up. Also if your bath is not freestanding now you can make up the framework and install the bath. Ensure the bath can be installed correctly enabling the thickness of the tiles and glue. Make sure to examine all linings and pipes before you continue together with your bathroom renovation.

Third step - Waterproof your bathroom

Waterproof your bathrooms floor, shower recess, and around the bath. When waterproofing the floor make sure that the waterproofing comes 100mm up the wall space. The shower recess should become waterproofed 100mm above the shower rose wall plug. Also, the bath ought to be waterproofed 100mm above the lip of the bath best around and to the ground. At the doorway using a 25 x 25mm aluminum angle glued into place with quality silicone and water-proof into the lip. All of your bathrooms should right now the tanked, therefore all water is only going to decrease a drain. Bathroom waterproofing suggestion: waterproofing is simple work but quality and precision are most important.

Fourth step - Lay in the cement screed intended for the floor.

Before the floor tiles can be laid the floor should be smooth and pretty flat with hook fall to the drainage outlet. To get this done you must make use of sand cement mix and it is greatest to put in a waterproofing agent into this as well. With a level, set the ground level at the doorway. Utilize the top aluminum position as the finished flooring level and measure straight down the thickness of the tile plus 10mm for the glue. Tag right around the toilet with a level and then screed in your sand cement blend with a 1 to 3 level fall to the top of the drain outlet. Invest some time and get it right with the completed level as clean as feasible. When the sand cement combine has set but isn't dry (you can walk onto it but you it is still a bit smooth) rub it over with a residence brick. This will remove all of the little highs and lows and talk with an even as you go. Allow bathroom floor fully dried out and you should have an excellent surface area to tile onto. Suggestion: the more function you placed into the floor screed the simpler your tiling will end up being.

Step five: Tile ground and walls

Lay your tiles on to the floor first and then grout. After that lay your wall structure tiles ensuring they are level as you lay. After the bathroom tiles have already been sliced and laid, grout all of your tiles and buff the tiles clean.

Step 6: Install plumbing fitting and fixtures

Install all your plumbing fixtures and taps. Also, fit all of your towel rails and soap holders. Fit your new bathroom vanity making sure it is level and sealed around the very best with silicone and also seal around the bath. Tip: get them to in the proper place before you drill into your tiles.

Stage seven: painting, and cleaning - enjoy

Color your ceiling and execute a final clean producing sure everything is installed correctly and that we now have zero leaks in your plumbing. - Enjoy your brand-new bathroom.